Solar FAQs
How much maintenance do solar power systems require?
Very minimal, a visual check of the equipment from you every month. Rest assured, our handover will cover this and we offer maintenance packages to suit.
How does the installation process work, and how long does it take?
Installation will usually be completed within a day. Scaffolding will go up within 48hrs before and will be removed within 48hrs after
How do I arrange a free survey?
The easiest way to arrange a survey is to complete our online quotation form and a member of our team will be in touch within 48 hours. Alternatively you can give our team a call on 01925 709 297
How do I determine the appropriate size and type of solar system for my property?
We can estimate your installation costs and provide a savings report by using your property address and software to assess your property remotely and provide a detailed analysis.