If your panels went up without a battery, you can almost always add one now and keep everything already on the roof. A battery added to an existing system starts from £1,999, whoever fitted the panels, and the price for your house is fixed in writing after a free survey.
Will my system take a battery?
Almost certainly. The battery never connects to the panels themselves. It sits with the inverter, usually in a utility room, garage or loft, and is wired into your consumer unit and meter. So the part that decides how the job is done is your inverter, not your roof.
There are two ways to do it:
- AC-coupled. A battery with its own inverter goes in alongside the solar inverter you have now, which carries on as it is. This suits most systems that are still working well, and it leaves the roof and the panel wiring alone.
- A hybrid inverter swap. Your existing inverter is replaced with a hybrid one that runs the panels and the battery together. This makes sense when the old inverter is near the end of its life, already showing faults, or can't be supported any more.
Which suits your system is a judgement the survey makes on the inverter in front of us. There's a longer explanation, with what each route involves, in our guide to adding a battery to existing solar panels.
What it costs
From £1,999. What moves the price is the route your system needs, the battery you choose and where it can go. Nothing is guessed: the survey looks at your inverter, consumer unit and meter set-up, then you get a written quote with the price fixed and 14 days to change your mind before anything is booked.
Battery storage qualifies for the VAT relief in its own right, so it applies to a battery added to existing solar as well as to a new system: 0% VAT on qualifying installations until 31 March 2027, then 5%.
Battery sizes and brands
We fit 6kWh and 12kWh batteries, the same two sizes as our solar and battery builds on the guide price table. Bring a recent bill to the survey and we'll size it against what your house actually uses.
Batteries and inverters come from Fox ESS, Tesla, Sigenergy, Sunsynk and Powervault. If a Tesla Powerwall is the battery you want, we fit it, and we also recommend the others on that list. The make and model going on your wall are named on your written quotation.
A battery can also keep your home running in a power cut, either chosen circuits or the whole house, when backup is specified at survey. A standard set-up switches off when the grid goes down, for safety.
What happens to Feed-in Tariff payments?
Your generation payments carry on. They are paid on what your generation meter records, and adding a battery doesn't change that reading. What you do need to do is tell your Feed-in Tariff licensee that storage has been added, with a diagram of how it's wired in, and we'll tell you at survey exactly where the battery sits relative to your meter and whether anything needs a call to them.
What's included, and the guarantees
The battery, set up for off-peak charging where your tariff supports it; a monitoring app set up before we leave; the grid connection paperwork; and the handover pack. A new inverter, if the survey says you need one, is on the same written quote.
The battery carries a manufacturer warranty of up to 12 years, confirmed in your handover pack once the brand and model are fixed. The inverter's warranty is set out on your quote, and our workmanship carries a 2 year Pro-Fit warranty. Pro-Fit is MCS certified for solar PV and battery storage (certificate NAP/83770/26/1), Flexi-Orb certified and an HIES member, so a battery added to someone else's panels is fitted to the same standards as a full new install.
Frequently asked questions
Does the grid need to be told about a battery?
Usually, yes, because the battery brings its own inverter. Up to 3.68kW (16A) per phase of combined inverter capacity it's a G98 notification after the job; above that it's a G99, which the network operator approves before installation. We handle the paperwork either way.
What if my inverter is old?
Then the survey checks whether it's worth keeping. An inverter near the end of its life, or one with no battery-ready path, is the usual reason a simple AC-coupled job becomes a hybrid inverter swap, and we'd rather tell you that before the battery goes in than a year after.
Is a battery added to existing solar zero rated for VAT?
Yes. HMRC added battery storage to the qualifying list in its own right from 1 February 2024, whether it's fitted with new panels or retrofitted to an existing system. 0% VAT on qualifying installations until 31 March 2027, then 5%.
Can you add a battery if another company fitted my panels?
Yes. We survey the inverter and wiring you have, whoever installed them, and quote on what's actually there.
How long does it take to fit?
An AC-coupled battery is usually quicker than a full solar and battery install, because the roof and panels aren't touched. A hybrid inverter swap takes longer. You get the timescale at survey.
Sources
- GOV.UK, HMRC Notice 708/6: VAT on energy-saving materials and heating equipment, https://www.gov.uk/guidance/vat-on-energy-saving-materials-and-heating-equipment-notice-7086, read 7 October 2026.
- Ofgem, "Feed-in Tariffs (FIT): Guidance for Generators" (Version 19, published 1 April 2026), sections 3 and 6 on adding storage, ofgem.gov.uk/publications/feed-tariffs-guidance-renewable-installations, read 7 October 2026.
- Sunsave Energy, "G98 solar applications: the expert guide", sunsave.energy/solar-panels-advice/planning-permission/g98-application, read 7 October 2026.
- Renew-Able, "G98, G99 & G100 explained", renew-able.co.uk/what-is-g98-g99-g100-all-explained-here, read 7 October 2026.