Rated 5.0 on Google

Solar in Hampshire

Six panels fully installed from £6,000, or £7,800 with a 6kWh battery. Scaffolding and 0% VAT included, and a free survey fixes your price in writing.

Elias Mugot
Really appreciated the team didn’t try to upsell me. Connor was able to help looking at our usage, roof angle and shading and design a good design that actually made sense for us going forward.

Google review, September 2026Solar design

Get your guide price

What type of property is it?

What are you looking for?

Rated 5.0on Google
MCScertified, NAP/83770/26/1
Free surveyno obligation
Fixed pricein writing after survey
0% VATends 31 March 2027

Areas we cover

Solar panels fitted across Hampshire.

The same published prices apply everywhere in Hampshire, and the survey is free. We cover Hampshire from our office in Poole.

  • Southampton
  • Portsmouth
  • Winchester
  • Basingstoke
  • Andover
  • Eastleigh
  • Fareham
  • Gosport
  • Havant
  • Petersfield
  • Romsey
  • Alton
  • Fleet
  • Farnborough
  • Aldershot
  • Ringwood
  • Fordingbridge
  • Lyndhurst
  • Brockenhurst
  • Lymington
  • New Milton

At a glance

What decides a solar job in Hampshire.

  • PlanningEleven district councils plus Portsmouth and Southampton
  • Protected landThe New Forest and South Downs National Parks, each its own planning authority
  • Grid operatorSSEN
  • Listed homesListed building consent is always needed

Guide prices in Hampshire

Fully installed with DMEGC 465W all-black panels, a battery-ready hybrid inverter, scaffolding and 0% VAT. The same table applies everywhere we work, and your survey fixes the price in writing.

Guide prices by number of panels and battery option, fully installed with scaffolding and 0% VAT
SystemOutputSolar only+ 6kWh battery+ 12kWh battery
6 panels2.79 kWp£6,000£7,800£9,500
8 panels3.72 kWp£6,400£8,200£9,900
10 panels4.65 kWp£6,800£8,500£10,100
12 panels5.58 kWp£7,200£8,900£10,500

0% VAT on qualifying installations until 31 March 2027, then 5%. What qualifies, or see every price and what can change it.

Call 01202 161222

Every installation

What every price includes

  • DMEGC 465W all-black panels
  • Hybrid inverter, battery-ready from day one
  • Battery where selected, set up for off-peak charging
  • Scaffolding, put up and taken down
  • Bird protection around the panels
  • Monitoring app, set up before we leave
  • Grid connection paperwork and handover pack
  • Help registering for export payments

Batteries and inverters from Fox ESS, Tesla, Sigenergy, Sunsynk and Powervault, named on your written quote. Backup through a power cut, for key circuits or the whole home, is priced at survey.

Two Pro-Fit installers fixing an all-black panel to the mounting rails on a pitched roof
Installed by Pro-Fit

What customers say about Pro-Fit.

Reviews
5.0
See our reviews on Google
  • Sam HoltonGoogle review, October 2026
    Layout of the panels are spot on, the team put in graft the last 2 days, big job done properly and smoothly! Excited to see the returns from this install!
    Solar
  • Keeley ShawGoogle review, October 2026
    Recently had 8 panels installed and Henry & theo were really polite and professional. From start to finish everything was great and no mess was made or left behind. Excellent - ⭐️⭐️⭐️⭐️⭐️
    Solar
  • safia segouiniGoogle review, October 2026
    Would definitely recommend to anyone considering solar. Really happy with the service from Pro Fit. The whole process was smooth from start to finish, and the team were friendly, professional and kept me informed throughout. The solar panels look great and everything was installed neatly and efficiently.
    Solar
  • jakGoogle review, September 2026
    Used them for panels and a battery. Fraser and Theo were professional from start to finish. Would definitely recommend. The design and layout were perfect.
    Solar and battery
  • BenGoogle review, September 2026
    Great work, the team arrived on time and have worked relentlessly to get the panels installed, was a 8 panel install and it looks superb, im pleased as they dont look ugly and actually compliment our new slate roof.
    Solar
  • Max WareGoogle review, September 2026
    Fraser installed 6 panels and the system is now up and running too. We cant wait to see the returns and we are so glad we've taken the step earlier rather than later. Thank you!
    Solar
  • AhmadGoogle review, September 2026
    Aaron has been a pleasure, the office when calling in were also super polite. Will definitely be using for future solar jobs on our other commercial properties.
    Commercial solar

How it works

  1. A guide price, or a call

    Answer five short questions for a guide price on screen, or ring us. We design a system around your roof and how you use electricity.

  2. Free home survey

    A surveyor checks your roof, loft, electrics and access. Your price is then fixed in writing, and you have 14 days to change your mind.

  3. Installation

    Usually one to two days on site, with scaffolding included in the price. We commission the system and notify the grid operator for you.

The local detail

What changes a solar job in Hampshire.

Hampshire is a bigger planning puzzle than most counties. It has eleven district councils, two city unitary authorities (Portsmouth and Southampton) and two National Parks, the New Forest and the South Downs. Which rules apply depends on your postcode, from Gosport and Hedge End to Romsey, Petersfield and the Solent coast.

Which council decides whether I need planning permission?

For most Hampshire homes it is the district or city council, and panels are usually permitted development, so no application is needed. Hampshire County Council covers the county as a whole, with eleven non-metropolitan districts below it, while Portsmouth and Southampton are separate unitary authorities1. Gosport, Hedge End and Romsey each sit under a different district, and any application goes to the council for your address. Inside a national park, a different body takes over.

Does living in the New Forest or the South Downs change anything?

Yes. Inside a national park the park authority, not the district council, is the planning authority. The New Forest National Park Authority has been the sole planning authority for the whole park since 2006, and about 95% of the park lies in Hampshire (New Forest National Park Authority, Statement of Common Ground with Hampshire County Council, May 2018). The Authority states that "there are slightly more restricted permitted development rights within the National Park" (New Forest National Park Authority, planning pages). The South Downs National Park Authority's Planning Committee is likewise "the statutory planning authority of the South Downs National Park", and Petersfield and its surrounding villages fall in that area.

Postcodes can mislead. The New Forest Authority warns that "some addresses fall under neighbouring planning authorities, even if they have a New Forest postcode". In or near Lymington, New Milton or the villages around Brockenhurst, use the Authority's postcode checker rather than assume either way. We check your actual address at survey, and the answer decides whether you speak to the park authority first. Our guide on whether you need planning permission for solar panels covers the national rules.

Can I fit panels on a thatched cottage or a listed home?

Hampshire has plenty of both, particularly in the New Forest villages and the chalk valleys, and they are treated differently.

For listed buildings the rule is firm. Historic England states that "listed building consent will always be required for the installation of photovoltaic and solar thermal panels", and says panels are generally acceptable on non-principal roofs, with valley and flat roofs preferred (Historic England, as reported by Construction Index). That means talking to the conservation officer before anything is booked.

Thatch is a different conversation. Where a thatched house has a garage, outbuilding or extension with a slate or tile roof, the array can often go there, and the survey says plainly what your property allows. Article 4 Directions, which a council can use to withdraw permitted development rights, are most common in conservation areas, as the New Forest Authority notes on its own planning pages, so a conservation area needs checking too.

Who is the grid operator in Hampshire?

Hampshire is in the licence area of Southern Electric Power Distribution, the SSEN business that distributes electricity across central southern England, including rural Hampshire, Dorset, Wiltshire and Oxfordshire, along with the Isle of Wight6. That is the operator we notify about your new array, and it is a different business from the company that sends your bill. The notification and grid connection paperwork are part of every quote.

Does the Solent coast change the fitting?

Homes near the Solent coast get salt-laden wind, so we talk through fixings and inverter position at survey rather than settle them from a brochure. If you want a battery too, our battery guide explains what size suits which household. Neighbouring Berkshire and the Isle of Wight have their own pages.

Sources for this page (7)
  1. Wikipedia, "Hampshire" (local government structure, national parks, chalk geology), https://en.wikipedia.org/wiki/Hampshire, read 29 October 2026.
  2. New Forest National Park Authority, "NPA HCC Statement of Common Ground May 2018" (sole planning authority since 2006, about 95% of the park in Hampshire), https://www.newforestnpa.gov.uk/app/uploads/2018/01/NPA-HCC-Statement-of-Common-Ground-May-2018.pdf, read 29 October 2026.
  3. New Forest National Park Authority, planning pages (postcode checker, more restricted permitted development, Article 4 Directions), https://www.newforestnpa.gov.uk/planning/, read 29 October 2026.
  4. South Downs National Park Authority, planning (Planning Committee is the statutory planning authority), https://www.southdowns.gov.uk/planning/, read 29 October 2026.
  5. Historic England, listed building consent for solar panels, as reported by Construction Index, "Solar panels and heat pumps OK on listed buildings, says Historic England", https://www.theconstructionindex.co.uk/news/view/solar-panels-and-heat-pumps-ok-on-listed-buildings-says-historic-england, read 29 October 2026.
  6. Wikipedia, "Scottish and Southern Electricity Networks" (SEPD licence area), https://en.wikipedia.org/wiki/Scottish_and_Southern_Electricity_Networks, read 29 October 2026.
  7. Pro-Fit Green Energy, published guide prices, pf-energy.com/pricing, read 29 October 2026.

Frequently asked questions

No obligation

Ask for a call back about solar in Hampshire.

What type of property is it?

What are you looking for?

Name, postcode and phone are needed. The rest is optional.

We use what you send here to answer you. If you said yes to advert matching in the cookie choices, Google Ads also receives your email address and phone number in scrambled (hashed) form, to match this enquiry to our adverts. See the privacy policy.

Six panels, no battery, from

£6,000

Six panels with a 6kWh battery from £7,800. Fixed in writing after a free survey.

  1. We ring you back to talk through your home and what you want.
  2. A free survey checks your roof, loft and electrics.
  3. Your price is fixed in writing, and you have 14 days to change your mind.

Rather see a figure first? Get your guide price online, or call 01202 161222.