Rated 5.0 on Google

Solar in the South West

Six panels fully installed from £6,000, or £7,800 with a 6kWh battery. Scaffolding and 0% VAT included, and a free survey fixes your price in writing.

safia segouini
Would definitely recommend to anyone considering solar. Really happy with the service from Pro Fit. The whole process was smooth from start to finish, and the team were friendly, professional and kept me informed throughout. The solar panels look great and everything was installed neatly and efficiently.

Google review, October 2026Solar

Get your guide price

What type of property is it?

What are you looking for?

Rated 5.0on Google
MCScertified, NAP/83770/26/1
Free surveyno obligation
Fixed pricein writing after survey
0% VATends 31 March 2027

Areas we cover

Every county we cover in the South West.

The same published prices apply everywhere in the South West, and the survey is free. We cover the South West from our office in Poole.

At a glance

What decides a solar job in the South West.

  • CountiesCornwall, Devon, Somerset, Dorset, Wiltshire, Gloucestershire and Bristol
  • Grid operatorsNGED from Bristol to Land's End, SSEN across Dorset and Wiltshire
  • Protected landDartmoor and Exmoor, the Jurassic Coast and the Cornwall and West Devon Mining Landscape
  • Solar so far4,613 MW across 276,898 installations in the region

Guide prices in the South West

Fully installed with DMEGC 465W all-black panels, a battery-ready hybrid inverter, scaffolding and 0% VAT. The same table applies everywhere we work, and your survey fixes the price in writing.

Guide prices by number of panels and battery option, fully installed with scaffolding and 0% VAT
SystemOutputSolar only+ 6kWh battery+ 12kWh battery
6 panels2.79 kWp£6,000£7,800£9,500
8 panels3.72 kWp£6,400£8,200£9,900
10 panels4.65 kWp£6,800£8,500£10,100
12 panels5.58 kWp£7,200£8,900£10,500

0% VAT on qualifying installations until 31 March 2027, then 5%. What qualifies, or see every price and what can change it.

Call 01202 161222

Every installation

What every price includes

  • DMEGC 465W all-black panels
  • Hybrid inverter, battery-ready from day one
  • Battery where selected, set up for off-peak charging
  • Scaffolding, put up and taken down
  • Bird protection around the panels
  • Monitoring app, set up before we leave
  • Grid connection paperwork and handover pack
  • Help registering for export payments

Batteries and inverters from Fox ESS, Tesla, Sigenergy, Sunsynk and Powervault, named on your written quote. Backup through a power cut, for key circuits or the whole home, is priced at survey.

A Pro-Fit installer lifting an all-black solar panel into place on a tiled roof, mounting rails already run
Installed by Pro-Fit

What customers say about Pro-Fit.

Reviews
5.0
See our reviews on Google
  • Sam HoltonGoogle review, October 2026
    Layout of the panels are spot on, the team put in graft the last 2 days, big job done properly and smoothly! Excited to see the returns from this install!
    Solar
  • Keeley ShawGoogle review, October 2026
    Recently had 8 panels installed and Henry & theo were really polite and professional. From start to finish everything was great and no mess was made or left behind. Excellent - ⭐️⭐️⭐️⭐️⭐️
    Solar
  • jakGoogle review, September 2026
    Used them for panels and a battery. Fraser and Theo were professional from start to finish. Would definitely recommend. The design and layout were perfect.
    Solar and battery
  • Elias MugotGoogle review, September 2026
    Really appreciated the team didn’t try to upsell me. Connor was able to help looking at our usage, roof angle and shading and design a good design that actually made sense for us going forward.
    Solar design
  • BenGoogle review, September 2026
    Great work, the team arrived on time and have worked relentlessly to get the panels installed, was a 8 panel install and it looks superb, im pleased as they dont look ugly and actually compliment our new slate roof.
    Solar
  • Max WareGoogle review, September 2026
    Fraser installed 6 panels and the system is now up and running too. We cant wait to see the returns and we are so glad we've taken the step earlier rather than later. Thank you!
    Solar
  • AhmadGoogle review, September 2026
    Aaron has been a pleasure, the office when calling in were also super polite. Will definitely be using for future solar jobs on our other commercial properties.
    Commercial solar

How it works

  1. A guide price, or a call

    Answer five short questions for a guide price on screen, or ring us. We design a system around your roof and how you use electricity.

  2. Free home survey

    A surveyor checks your roof, loft, electrics and access. Your price is then fixed in writing, and you have 14 days to change your mind.

  3. Installation

    Usually one to two days on site, with scaffolding included in the price. We commission the system and notify the grid operator for you.

The local detail

What changes a solar job in the South West.

From Land's End to the Wiltshire downs, the kit is the same. What changes across the South West is your electricity network operator, whether a National Park authority or a heritage designation sits over your roof, and how much weather your fixings take. Find your county below; the survey checks all three against your address.

Which South West county page is yours?

Each county page covers what is true only there.

Cornwall: the Cornwall National Landscape covers about 27% of the county in 12 separate sections, 11 of them on the coast and one on Bodmin Moor (Wikipedia). Truro and Hayle roofs are often slate, and Delabole in the north is England's oldest working slate quarry.

Devon: the only county with a National Park wholly inside it, Dartmoor, plus a share of Exmoor. Cob walls under thatch are the classic Devon house, and Honiton, Tiverton, Barnstaple and Plymouth all have older stock where the survey matters.

Somerset: 71% of Exmoor sits in Somerset, alongside the Mendip Hills, Quantock Hills and Blackdown Hills National Landscapes, and the county has been run by a single unitary Somerset Council since 2023 (Wikipedia).

Dorset: the Jurassic Coast World Heritage Site runs 154 km from Exmouth in Devon to Studland Bay (Wikipedia), so many Dorset roofs sit within sight of the sea.

Wiltshire: Stonehenge and Avebury form a World Heritage Site of two areas, 26 and 22.5 square kilometres (Wikipedia), and Devizes, Chippenham, Calne, Melksham, Warminster and Salisbury are the market towns around it.

Gloucestershire: the Cotswolds National Landscape is the largest in England and Wales at 2,038 square kilometres (Wikipedia), and the county also holds the Forest of Dean, Cheltenham, Gloucester, and the south Gloucestershire towns of Yate, Thornbury and Chipping Sodbury.

Bristol: Bristol City Council lists 33 conservation areas, covering roughly 30% of the city, with Clifton the best known. Portishead and Clevedon are North Somerset, not Bristol.

Who runs the grid in the South West?

Your distribution network operator (DNO) owns the local wires and substations, and the grid notification for a new solar system goes to it, not to your energy supplier. The region has two main operators; your electricity bill or the Energy Networks Association's postcode lookup names yours.

National Grid Electricity Distribution (NGED) runs the South West licence area, which stretches from the Bristol and Bath area down to Land's End and includes the Isles of Scilly (National Grid, South West Network Development Report). That covers Cornwall, Devon, Bristol and most of Somerset, including Taunton and Weston-super-Mare.

Scottish and Southern Electricity Networks (SSEN) runs the central southern England network, whose area Wikipedia describes as rural communities in Hampshire, Dorset, Wiltshire, Gloucestershire and Oxfordshire. So Dorset and most of Wiltshire are SSEN country. Gloucestershire is the county to watch: a South Gloucestershire Council paper names NGED as the principal operator there, while SSEN's own description includes rural Gloucestershire. We confirm yours from your postcode before the notification goes in.

Where do National Parks and heritage sites change the rules?

Most South West houses are covered by permitted development, so a roof of panels needs no planning application. The Planning Portal says the rules for solar on houses changed on 27 August 2026, with a transitional period to 27 August 2027 in which you can follow either set. In conservation areas and World Heritage Sites, panels must not go on a wall, balcony or roof enclosure that fronts a highway. On designated land, which the Portal says includes National Parks and National Landscapes, a flat-roof installation needs prior approval from the local planning authority. Our planning permission guide has the detail.

Two South West parks are their own planning authorities. Dartmoor National Park Authority manages the 954 square kilometre park (Wikipedia) and publishes a planning FAQ on solar. Exmoor National Park Authority, whose park is 71% in Somerset and 29% in Devon (Wikipedia), publishes domestic solar PV guidance that treats panels on a house roof as generally not needing permission, while ground-mounted arrays are likely to. If your address is near either boundary, ask the park authority, not the district council.

Heritage designations add a second layer. The Cornwall and West Devon Mining Landscape is a World Heritage Site with 10 component parts, inscribed in 2006 (UNESCO), and Cornwall Council has adopted a planning document for it. Bath is a World Heritage Site too (Wikipedia, Somerset). None of this rules out solar, and we check your address against each designation before we quote.

Do coast, wind and low ground change the fitting?

Coast and wind matter more in this region than almost anywhere in England, as the Cornwall and Dorset entries above show. Salt air corrodes steel fixings faster than at a sheltered inland site, and an exposed roof sees stronger wind, so at survey we check the fixing specification against your exposure. That is part of the free survey, not an extra on your quote.

Low ground is the other South West difference. The Somerset Levels are a wetland of about 647.5 square kilometres where pumping and water-level management still go on (Wikipedia). A battery holds electronics, so if your property has taken water before, we talk through a raised or dry position for it. Our battery storage page covers the options.

How much solar is already installed in the South West?

DESNZ's Solar photovoltaics deployment statistics, published on 29 October 2026, give regional totals to the end of September 2026. The South West has 4,613 MW of solar PV capacity across 276,898 installations, the largest of any English region by capacity. The South East has more installations, 312,166, but less capacity, 3,852 MW. The figures count every PV scheme in DESNZ's sources, solar farms included. They are provisional and revised as late registrations arrive, and DESNZ says they do not capture every unsubsidised system below 150 kW.

Sources for this page (18)
  1. Department for Energy Security and Net Zero, "Solar photovoltaics deployment in the UK, September 2026 (Table 4, by region)", https://www.gov.uk/government/statistics/solar-photovoltaics-deployment, read 29 October 2026
  2. Planning Portal, "Solar panels: solar equipment mounted on a house or a block of flats or on a building", https://www.planningportal.co.uk/permission/common-projects/solar-panels/planning-permission-solar-equipment-mounted-on-a-house-or-a-block-of-flats-or-on-a-building, read 29 October 2026
  3. National Grid Electricity Distribution, "The South West Network Development Report", https://dso.nationalgrid.co.uk/downloads/14799/south-west-licence-area-report.pdf, read 29 October 2026 (through a search extract)
  4. Wikipedia, "Scottish and Southern Electricity Networks", https://en.wikipedia.org/wiki/Scottish_and_Southern_Electricity_Networks, read 29 October 2026
  5. South Gloucestershire Council, "Electricity: National Grid Electricity Distribution, Infrastructure Position Statement Topic Paper", https://beta-edit.southglos.gov.uk/wp-content/uploads/10.-Electricity-National-Grid-Electricity-Distribution-–-Infrastructure-Position-Statement-Topic-Paper.pdf, read 29 October 2026
  6. Bristol City Council, "Conservation areas", https://bristol.gov.uk/planning-and-building-regulations/conservation-areas, read 29 October 2026
  7. Wikipedia, "Cornwall Area of Outstanding Natural Beauty", https://en.wikipedia.org/wiki/Cornwall_Area_of_Outstanding_Natural_Beauty, read 29 October 2026
  8. Wikipedia, "Delabole slate", https://en.wikipedia.org/wiki/Delabole_slate, read 29 October 2026
  9. Wikipedia, "Dartmoor", https://en.wikipedia.org/wiki/Dartmoor, read 29 October 2026
  10. Wikipedia, "Exmoor", https://en.wikipedia.org/wiki/Exmoor, read 29 October 2026
  11. Wikipedia, "Devon", https://en.wikipedia.org/wiki/Devon, read 29 October 2026
  12. Wikipedia, "Somerset", https://en.wikipedia.org/wiki/Somerset, read 29 October 2026
  13. Wikipedia, "Jurassic Coast", https://en.wikipedia.org/wiki/Jurassic_Coast, read 29 October 2026
  14. Wikipedia, "Stonehenge, Avebury and Associated Sites", https://en.wikipedia.org/wiki/Stonehenge,_Avebury_and_Associated_Sites, read 29 October 2026
  15. Wikipedia, "Cotswolds", https://en.wikipedia.org/wiki/Cotswolds, read 29 October 2026
  16. UNESCO World Heritage Centre, "Cornwall and West Devon Mining Landscape", https://whc.unesco.org/en/soc/4461, read 29 October 2026
  17. Exmoor National Park Authority, "Guidance for Domestic Solar PV", https://exmoor-nationalpark.gov.uk/planning/planning-advice/domestic-solar-pv, read 29 October 2026 (through a search extract)
  18. Dartmoor National Park Authority, "Do I need planning permission for solar panels?", https://www.dartmoor.gov.uk/living-and-working/planning/frequently-asked-questions/planning-faqs/do-i-need-planning-permission-for-solar-panels, read 29 October 2026 (through a search extract)

Frequently asked questions

No obligation

Ask for a call back about solar in the South West.

What type of property is it?

What are you looking for?

Name, postcode and phone are needed. The rest is optional.

We use what you send here to answer you. If you said yes to advert matching in the cookie choices, Google Ads also receives your email address and phone number in scrambled (hashed) form, to match this enquiry to our adverts. See the privacy policy.

Six panels, no battery, from

£6,000

Six panels with a 6kWh battery from £7,800. Fixed in writing after a free survey.

  1. We ring you back to talk through your home and what you want.
  2. A free survey checks your roof, loft and electrics.
  3. Your price is fixed in writing, and you have 14 days to change your mind.

Rather see a figure first? Get your guide price online, or call 01202 161222.