Rated 5.0 on Google

Solar in Gloucestershire

Six panels fully installed from £6,000, or £7,800 with a 6kWh battery. Scaffolding and 0% VAT included, and a free survey fixes your price in writing.

Ben
Great work, the team arrived on time and have worked relentlessly to get the panels installed, was a 8 panel install and it looks superb, im pleased as they dont look ugly and actually compliment our new slate roof.

Google review, September 2026Solar

Get your guide price

What type of property is it?

What are you looking for?

Rated 5.0on Google
MCScertified, NAP/83770/26/1
Free surveyno obligation
Fixed pricein writing after survey
0% VATends 31 March 2027

Areas we cover

Solar panels fitted across Gloucestershire.

The same published prices apply everywhere in Gloucestershire, and the survey is free. We cover Gloucestershire from our office in Poole.

  • Gloucester
  • Cheltenham
  • Stroud
  • Cirencester
  • Tewkesbury
  • Tetbury
  • Stow-on-the-Wold
  • Chipping Campden
  • Lydney
  • Cinderford
  • Yate
  • Thornbury

At a glance

What decides a solar job in Gloucestershire.

  • PlanningSix district councils, with South Gloucestershire separate
  • Protected landThe Cotswolds National Landscape, the largest in England, and the Wye Valley
  • Grid operatorNGED or SSEN, depending on the area
  • RoofsCotswold stone slate, heavy and steeply pitched

Guide prices in Gloucestershire

Fully installed with DMEGC 465W all-black panels, a battery-ready hybrid inverter, scaffolding and 0% VAT. The same table applies everywhere we work, and your survey fixes the price in writing.

Guide prices by number of panels and battery option, fully installed with scaffolding and 0% VAT
SystemOutputSolar only+ 6kWh battery+ 12kWh battery
6 panels2.79 kWp£6,000£7,800£9,500
8 panels3.72 kWp£6,400£8,200£9,900
10 panels4.65 kWp£6,800£8,500£10,100
12 panels5.58 kWp£7,200£8,900£10,500

0% VAT on qualifying installations until 31 March 2027, then 5%. What qualifies, or see every price and what can change it.

Call 01202 161222

Every installation

What every price includes

  • DMEGC 465W all-black panels
  • Hybrid inverter, battery-ready from day one
  • Battery where selected, set up for off-peak charging
  • Scaffolding, put up and taken down
  • Bird protection around the panels
  • Monitoring app, set up before we leave
  • Grid connection paperwork and handover pack
  • Help registering for export payments

Batteries and inverters from Fox ESS, Tesla, Sigenergy, Sunsynk and Powervault, named on your written quote. Backup through a power cut, for key circuits or the whole home, is priced at survey.

A Pro-Fit installer in a hard hat and hi-vis lifting an all-black solar panel onto a domestic roof, access platform behind him
Installed by Pro-Fit

What customers say about Pro-Fit.

Reviews
5.0
See our reviews on Google
  • Sam HoltonGoogle review, October 2026
    Layout of the panels are spot on, the team put in graft the last 2 days, big job done properly and smoothly! Excited to see the returns from this install!
    Solar
  • Keeley ShawGoogle review, October 2026
    Recently had 8 panels installed and Henry & theo were really polite and professional. From start to finish everything was great and no mess was made or left behind. Excellent - ⭐️⭐️⭐️⭐️⭐️
    Solar
  • safia segouiniGoogle review, October 2026
    Would definitely recommend to anyone considering solar. Really happy with the service from Pro Fit. The whole process was smooth from start to finish, and the team were friendly, professional and kept me informed throughout. The solar panels look great and everything was installed neatly and efficiently.
    Solar
  • jakGoogle review, September 2026
    Used them for panels and a battery. Fraser and Theo were professional from start to finish. Would definitely recommend. The design and layout were perfect.
    Solar and battery
  • Elias MugotGoogle review, September 2026
    Really appreciated the team didn’t try to upsell me. Connor was able to help looking at our usage, roof angle and shading and design a good design that actually made sense for us going forward.
    Solar design
  • Max WareGoogle review, September 2026
    Fraser installed 6 panels and the system is now up and running too. We cant wait to see the returns and we are so glad we've taken the step earlier rather than later. Thank you!
    Solar
  • AhmadGoogle review, September 2026
    Aaron has been a pleasure, the office when calling in were also super polite. Will definitely be using for future solar jobs on our other commercial properties.
    Commercial solar

How it works

  1. A guide price, or a call

    Answer five short questions for a guide price on screen, or ring us. We design a system around your roof and how you use electricity.

  2. Free home survey

    A surveyor checks your roof, loft, electrics and access. Your price is then fixed in writing, and you have 14 days to change your mind.

  3. Installation

    Usually one to two days on site, with scaffolding included in the price. We commission the system and notify the grid operator for you.

The local detail

What changes a solar job in Gloucestershire.

For most Gloucestershire houses, the panels are the easy part. What shapes the job is the roof underneath: in the Cotswolds it may be stone, and stone is heavy.

What if my roof is Cotswold stone?

Then the survey matters more than on a concrete-tiled estate. Stone slate roofing is, in Cotswold District Council's words, "second only in importance, as a building material, to stone walling" across the Cotswolds, and it is still found from Chipping Campden in the north to near Bath in the south (Cotswold District Council, "Cotswold Stone Slate Roofing: Technical guidance for owners and occupiers", April 2000).

The guide's figures matter for panels. A stone slate roof weighs about 1,000 kg per 10 square metres, the usual pitch is 47 to 55 degrees, and the slates run in diminishing courses, from the largest at the eaves to the smallest, only 150 mm long, towards the ridge. Stone splits naturally into uneven sizes, so no two courses are quite alike. The council also notes that many listed buildings have stone slate roofs, and that where an extension to one is permitted, stone slate is often required.

A fixing made for machine-made tile may not suit hand-split stone. At survey we judge from the loft and the roof surface whether panels can go on, and how, and say plainly if a ground array or an outbuilding is the better answer. Many Gloucestershire homes are not stone at all.

Is my house inside the Cotswolds or the Wye Valley?

The Cotswolds National Landscape (the name used since November 2023 for the Area of Outstanding Natural Beauty) covers 2,038 square km, the largest in England, and most of it lies in the east of Gloucestershire2. The Wye Valley National Landscape, designated in 1971 and covering 326 square km, also reaches into the county4.

The designation protects how the landscape looks but does not by itself ban rooftop solar on a house. Council officers weigh panels on Cotswolds buildings against landscape and heritage impact, and the cases that go wrong tend to involve listed barns. In one reported case, panels fixed to a listed barn without consent ended in an enforcement notice and a dismissed appeal (Cheltenham Borough Council, officer report, Ham Court, Ham Road). We check listing and conservation status against your address before we quote, and our planning permission guide sets out where permitted development stops.

Which council is mine, and where does South Gloucestershire fit?

Gloucestershire has six districts (Cheltenham, Cotswold, Forest of Dean, Gloucester, Stroud and Tewkesbury) and one separate authority: South Gloucestershire, a unitary council independent of the county council but still in the ceremonial county3.

Chipping Sodbury and Yate, a market town and its larger neighbour, are in South Gloucestershire, about 13 miles north-east of Bristol5, and so is Thornbury. They deal with South Gloucestershire Council, not Gloucestershire County Council. Cheltenham, Gloucester and Stroud have their own district councils for planning, and the county council's highways service looks after the roads.

Why is Cheltenham different from Gloucester?

Cheltenham is described as "the most complete regency town in England"6. The spa grew after mineral springs were found in 1716, and Pittville, laid out from 1825 by Joseph Pitt, is a planned Regency extension to the north. Many Regency buildings are listed, so in a terrace of that age we check listing and conservation area status early, because the council decides whether consent is needed.

Gloucester has its own district planning service, so the same checks run against a different map. Cheltenham sits just inside the edge of the Cotswolds, with Cleeve Hill, at 330 m, the highest point in the county.

Who runs the grid in Gloucestershire?

It varies across the county. In the Forest of Dean, the district council's infrastructure plan names Western Power Distribution, now National Grid Electricity Distribution (NGED), as the regional distribution operator (Forest of Dean District Council, Infrastructure Delivery Plan, February 2015). In South Gloucestershire, NGED is the principal operator (South Gloucestershire Council, Infrastructure Position Statement topic paper on electricity). Scottish and Southern Electricity Networks (SSEN) describes its Central Southern England area as including Gloucestershire10, and its Minety supply point lists Cotswold District Council among the areas it feeds11. So Cirencester and Lydney may have different operators. We confirm yours at survey and notify them.

What if my home sits low in the Severn vale?

The River Severn bisects the county, and in July 2007 Gloucestershire saw some of the worst flooding in recorded British history, with the RAF rescuing over 120 residents3. If your home sits low in the vale, tell us at survey: a battery holds electronics and needs a dry spot, so we look at where water has reached and choose a raised or interior position.

Sources for this page (13)
  1. Cotswold District Council, "Cotswold Stone Slate Roofing: Technical guidance for owners and occupiers," April 2000, https://www.cotswold.gov.uk/media/hojnam3m/cotswold-stone-slate-roofing-technical-guidance-2000.pdf, read 29 October 2026
  2. Wikipedia, "Cotswolds," https://en.wikipedia.org/wiki/Cotswolds, read 29 October 2026
  3. Wikipedia, "Gloucestershire," https://en.wikipedia.org/wiki/Gloucestershire, read 29 October 2026
  4. Wikipedia, "Wye Valley," https://en.wikipedia.org/wiki/Wye_Valley, read 29 October 2026
  5. Wikipedia, "Chipping Sodbury," https://en.wikipedia.org/wiki/Chipping_Sodbury, read 29 October 2026
  6. Wikipedia, "Cheltenham," https://en.wikipedia.org/wiki/Cheltenham, read 29 October 2026
  7. Cheltenham Borough Council, planning committee officer report, Ham Court, Ham Road, https://democracy.cheltenham.gov.uk/documents/s12378/Ham%20Court%20Ham%20Road%20-%20officer%20report.pdf, read 29 October 2026 (from a search summary; the report itself was not opened)
  8. Forest of Dean District Council, Infrastructure Delivery Plan, February 2015, https://www.fdean.gov.uk/media/uhtdxz1e/infrastructure-delivery-plan.pdf, read 29 October 2026 (from a search summary)
  9. South Gloucestershire Council, "Electricity: National Grid Electricity Distribution, Infrastructure Position Statement Topic Paper," https://beta-edit.southglos.gov.uk/wp-content/uploads/10.-Electricity-National-Grid-Electricity-Distribution-%E2%80%93-Infrastructure-Position-Statement-Topic-Paper.pdf, read 29 October 2026 (from a search summary)
  10. Wikipedia, "Scottish and Southern Electricity Networks," https://en.wikipedia.org/wiki/Scottish_and_Southern_Electricity_Networks, read 29 October 2026
  11. SSEN, "Minety Grid Supply Point: Strategic Development Plan" (consultation version, October 2025), published on SSEN's distribution system operator consultations pages, read 29 October 2026
  12. Gloucestershire County Council, "Highways licences, permits and permissions," https://www.gloucestershire.gov.uk/apply-for/highways-licenses-permits-and-permissions, read 29 October 2026
  13. National Landscapes, on the November 2023 rename of Areas of Outstanding Natural Beauty, https://national-landscapes.org.uk/about, read 29 October 2026

Frequently asked questions

No obligation

Ask for a call back about solar in Gloucestershire.

What type of property is it?

What are you looking for?

Name, postcode and phone are needed. The rest is optional.

We use what you send here to answer you. If you said yes to advert matching in the cookie choices, Google Ads also receives your email address and phone number in scrambled (hashed) form, to match this enquiry to our adverts. See the privacy policy.

Six panels, no battery, from

£6,000

Six panels with a 6kWh battery from £7,800. Fixed in writing after a free survey.

  1. We ring you back to talk through your home and what you want.
  2. A free survey checks your roof, loft and electrics.
  3. Your price is fixed in writing, and you have 14 days to change your mind.

Rather see a figure first? Get your guide price online, or call 01202 161222.