Rated 5.0 on Google

Solar in Hertfordshire

Six panels fully installed from £6,000, or £7,800 with a 6kWh battery. Scaffolding and 0% VAT included, and a free survey fixes your price in writing.

jak
Used them for panels and a battery. Fraser and Theo were professional from start to finish. Would definitely recommend. The design and layout were perfect.

Google review, September 2026Solar and battery

Get your guide price

What type of property is it?

What are you looking for?

Rated 5.0on Google
MCScertified, NAP/83770/26/1
Free surveyno obligation
Fixed pricein writing after survey
0% VATends 31 March 2027

Areas we cover

Solar panels fitted across Hertfordshire.

The same published prices apply everywhere in Hertfordshire, and the survey is free. We cover Hertfordshire from our office in Poole.

  • St Albans
  • Watford
  • Hemel Hempstead
  • Berkhamsted
  • Tring
  • Harpenden
  • Welwyn Garden City
  • Hatfield
  • Stevenage
  • Hitchin
  • Letchworth
  • Hertford
  • Ware
  • Bishop's Stortford
  • Royston

At a glance

What decides a solar job in Hertfordshire.

  • PlanningTen district councils, and an Article 4 Direction in St Albans
  • Estate consentWelwyn Garden City and Letchworth need estate consent as well as planning
  • Protected landThe Chilterns National Landscape in the west
  • Grid operatorUK Power Networks

Guide prices in Hertfordshire

Fully installed with DMEGC 465W all-black panels, a battery-ready hybrid inverter, scaffolding and 0% VAT. The same table applies everywhere we work, and your survey fixes the price in writing.

Guide prices by number of panels and battery option, fully installed with scaffolding and 0% VAT
SystemOutputSolar only+ 6kWh battery+ 12kWh battery
6 panels2.79 kWp£6,000£7,800£9,500
8 panels3.72 kWp£6,400£8,200£9,900
10 panels4.65 kWp£6,800£8,500£10,100
12 panels5.58 kWp£7,200£8,900£10,500

0% VAT on qualifying installations until 31 March 2027, then 5%. What qualifies, or see every price and what can change it.

Call 01202 161222

Every installation

What every price includes

  • DMEGC 465W all-black panels
  • Hybrid inverter, battery-ready from day one
  • Battery where selected, set up for off-peak charging
  • Scaffolding, put up and taken down
  • Bird protection around the panels
  • Monitoring app, set up before we leave
  • Grid connection paperwork and handover pack
  • Help registering for export payments

Batteries and inverters from Fox ESS, Tesla, Sigenergy, Sunsynk and Powervault, named on your written quote. Backup through a power cut, for key circuits or the whole home, is priced at survey.

A Pro-Fit installer lifting an all-black solar panel into place on a tiled roof, mounting rails already run
Installed by Pro-Fit

What customers say about Pro-Fit.

Reviews
5.0
See our reviews on Google
  • Sam HoltonGoogle review, October 2026
    Layout of the panels are spot on, the team put in graft the last 2 days, big job done properly and smoothly! Excited to see the returns from this install!
    Solar
  • Keeley ShawGoogle review, October 2026
    Recently had 8 panels installed and Henry & theo were really polite and professional. From start to finish everything was great and no mess was made or left behind. Excellent - ⭐️⭐️⭐️⭐️⭐️
    Solar
  • safia segouiniGoogle review, October 2026
    Would definitely recommend to anyone considering solar. Really happy with the service from Pro Fit. The whole process was smooth from start to finish, and the team were friendly, professional and kept me informed throughout. The solar panels look great and everything was installed neatly and efficiently.
    Solar
  • Elias MugotGoogle review, September 2026
    Really appreciated the team didn’t try to upsell me. Connor was able to help looking at our usage, roof angle and shading and design a good design that actually made sense for us going forward.
    Solar design
  • BenGoogle review, September 2026
    Great work, the team arrived on time and have worked relentlessly to get the panels installed, was a 8 panel install and it looks superb, im pleased as they dont look ugly and actually compliment our new slate roof.
    Solar
  • Max WareGoogle review, September 2026
    Fraser installed 6 panels and the system is now up and running too. We cant wait to see the returns and we are so glad we've taken the step earlier rather than later. Thank you!
    Solar
  • AhmadGoogle review, September 2026
    Aaron has been a pleasure, the office when calling in were also super polite. Will definitely be using for future solar jobs on our other commercial properties.
    Commercial solar

How it works

  1. A guide price, or a call

    Answer five short questions for a guide price on screen, or ring us. We design a system around your roof and how you use electricity.

  2. Free home survey

    A surveyor checks your roof, loft, electrics and access. Your price is then fixed in writing, and you have 14 days to change your mind.

  3. Installation

    Usually one to two days on site, with scaffolding included in the price. We commission the system and notify the grid operator for you.

The local detail

What changes a solar job in Hertfordshire.

You can have solar panels almost anywhere in Hertfordshire, and most houses need no planning application. The catch is that two of the county's best-known towns, Welwyn Garden City and Letchworth, run their own consent schemes on top of planning. Across most of the rest, a council rule, a designation or the roof material changes what the survey looks at.

Both were built as garden cities, and each still has a body that controls changes to homes on top of the council. Welwyn Garden City's town centre is neo-Georgian, laid out along tree-lined boulevards12, which is one reason its scheme takes the look of a street seriously.

In Welwyn Garden City, Welwyn Hatfield Borough Council runs the Estate Management Scheme, which it says "covers most of Welwyn Garden City". Its sustainability page says you typically do not need planning permission now for solar panels, but you will need Estate Management consent if you live in the scheme, and it encourages panels at the back of the property. Its planning portal shows many such consent applications for solar. A 2025 delegated report indicates the council's approach has relaxed since the 2019 climate emergency, so front-facing panels can now be acceptable if they meet the design criteria. That is from a single report, and we have not read the current Design Guide in full, so confirm the front-roof point for your street.

In Letchworth, the Heritage Foundation operates a Scheme of Management. Its page on altering your home says the requirement "is separate from the permission required from the local authority under planning", lists solar and PV panels among the alterations that need its consent, and says the scheme applies to all freehold premises within the estate. Leaseholders may also need to apply under their lease. The Foundation published Solar Panel Design Principles in May 2026, and a consultation page says the Heritage Character Area principles require panels on rear roof slopes, away from public view. We could not open the full principles document, so we cannot say what each character area allows.

We tell you at the start when either consent is needed, so it never surprises you after a quote, and we do not apply for it without your instruction. In Hatfield, Stevenage or Hitchin neither scheme applies by default, though conservation areas and listed buildings still might. Our planning permission guide covers the national rules.

Which council and which designation applies to my street?

Hertfordshire has ten districts: Broxbourne, Dacorum, East Hertfordshire, Hertsmere, North Hertfordshire, St Albans, Stevenage, Three Rivers, Watford and Welwyn Hatfield11. Planning questions go to the one for your address, not to Hertfordshire County Council, which looks after the highways.

Some publish their own solar guidance. St Albans City and District Council says that within an Article 4 Direction area planning permission is required to install solar panels in all instances, and that in a conservation area or World Heritage Site panels must not be fitted to a wall that fronts a highway. It also encourages panels on the roof slope that does not face a road. If you live in the historic centre of St Albans, check the Article 4 map before you collect quotes.

Dacorum says it has more than 2,000 listed buildings and 25 conservation areas, worth knowing in Berkhamsted, Tring and Hemel Hempstead's old town.

The Chilterns and the Green Belt

The Chiltern Hills sit in the far west of the county around Tring, Berkhamsted and the Ashridge estate11. That ground is part of the Chilterns National Landscape, the name now used for what was an Area of Outstanding Natural Beauty (Chilterns Conservation Board). We found no source saying that designation alone stops rooftop panels on a house, but councils do test large ground arrays against it, so ask us to check your boundary.

Much of Hertfordshire is Metropolitan Green Belt11. In the planning reports we read, such as the Hertsmere solar farm appeal documents, Green Belt is the issue for solar farms and extensive ground arrays. We found no source saying it removes permitted development for panels on a house roof.

What Hertfordshire roofs mean for the survey

The Pevsner guide describes the county as largely rural, with numerous timber-framed buildings and Georgian houses in the small towns (Yale University Press listing for Pevsner's "Hertfordshire"). A Historic England listing for a farmhouse at Essendon combines a seventeenth century or earlier timber-framed core with late nineteenth century flint and yellow stock brick under plain tile roofs. Plain clay tile is the covering to expect on a Hertfordshire village house.

Clay plain tile is lighter than stone slate but more fragile underfoot, and hooks must be matched to the tile and its batten spacing. In a timber-framed house, the old roof structure was built for a lighter load than a modern one. We look at the rafters and the loft at survey, and say plainly when a ground array, an outbuilding or an in-roof system is the better answer. If a roof needs work, our guide to in-roof or on-roof solar explains the trade-off.

Who runs the grid in Hertfordshire, and who licenses scaffolding?

UK Power Networks runs the Eastern Power Networks licence, and its history page places Hertfordshire in the old Eastern area, alongside Suffolk, Essex, Cambridgeshire, parts of Buckinghamshire and most of Bedfordshire. The operator is set by your address and meter, so we confirm it at survey and send the grid notification to them.

Scaffolding on a public pavement needs a licence. Hertfordshire County Council issues it, says it usually takes 3 weeks to process, and requires red and white banding up to 2.5m and a 1.2m clear walkway on the footway. Broxbourne is the exception: applications there go to Broxbourne Borough Council. We arrange the scaffolding and the cost is inside the price.

Sources for this page (17)
  1. Welwyn Hatfield Borough Council, "Planning considerations: sustainable development," https://www.welhat.gov.uk/planning-applications/planning-considerations-sustainable-development, read 30 October 2026
  2. Welwyn Hatfield Borough Council, "Welwyn Garden City Estate Management Scheme," http://www.welhat.gov.uk/Welwyn-Garden-City-Estate-Management-Scheme, read 30 October 2026
  3. Welwyn Hatfield Borough Council, Estate Management Scheme delegated report and policies archive, https://archive.welhat.gov.uk/article/843/Estate-Management-Scheme-Policies, read 30 October 2026 (from a search summary; the current Design Guide was not opened)
  4. Letchworth Garden City Heritage Foundation, "About altering your home," https://www.letchworth.com/your-home/about-altering-your-home/, read 30 October 2026
  5. Letchworth Garden City Heritage Foundation, "Solar Panel Consultation," https://www.letchworth.com/solar/, read 30 October 2026
  6. Letchworth Garden City Heritage Foundation, "Solar Panel Design Principles," May 2026, https://www.letchworth.com/your-home/forms-guides/solar-panel-design-principles/, read 30 October 2026 (document listed, contents not read)
  7. St Albans City and District Council, "Solar panel guidance," https://stalbans.gov.uk/solar-panel-guidance, read 30 October 2026
  8. Dacorum Borough Council, "Conservation and design," https://www.dacorum.gov.uk/home/planning-development/planning-cons-design, read 30 October 2026
  9. Hertfordshire County Council, "Scaffolding licence," https://www.hertfordshire.gov.uk/services/highways-roads-and-pavements/business-and-developer-information/business-licences/scaffolding-licence.aspx, read 30 October 2026
  10. Chilterns Conservation Board, "About the Chilterns National Landscape," https://www.chilterns.org.uk/our-landscape/about-the-chilterns-national-landscape/, read 30 October 2026
  11. Wikipedia, "Hertfordshire," https://en.wikipedia.org/wiki/Hertfordshire, read 30 October 2026
  12. Wikipedia, "Welwyn Garden City," https://en.wikipedia.org/wiki/Welwyn_Garden_City, read 30 October 2026
  13. Wikipedia, "Letchworth," https://en.wikipedia.org/wiki/Letchworth, read 30 October 2026
  14. UK Power Networks, "Our history," https://ukpowernetworks.co.uk/our-company/our-history, read 30 October 2026 (from a search summary; the page itself returned an error)
  15. Yale University Press, listing for Pevsner Architectural Guides, "Hertfordshire," https://yalebooks.yale.edu/9780300223903/hertfordshire, read 30 October 2026 (from a search summary)
  16. Historic England listing, farmhouse at Essendon, via British Listed Buildings, https://britishlistedbuildings.co.uk/101348159, read 30 October 2026 (from a search summary)
  17. Hertsmere Borough Council, solar farm appeal documents, https://www.hertsmere.gov.uk (Planning Enforcement, solar farm appeal documents, planning committee report), read 30 October 2026 (from a search summary)

Frequently asked questions

No obligation

Ask for a call back about solar in Hertfordshire.

What type of property is it?

What are you looking for?

Name, postcode and phone are needed. The rest is optional.

We use what you send here to answer you. If you said yes to advert matching in the cookie choices, Google Ads also receives your email address and phone number in scrambled (hashed) form, to match this enquiry to our adverts. See the privacy policy.

Six panels, no battery, from

£6,000

Six panels with a 6kWh battery from £7,800. Fixed in writing after a free survey.

  1. We ring you back to talk through your home and what you want.
  2. A free survey checks your roof, loft and electrics.
  3. Your price is fixed in writing, and you have 14 days to change your mind.

Rather see a figure first? Get your guide price online, or call 01202 161222.